You are here

Customer Stories

Title Description Download
A Carbon Fiber Composite Manufacturer

"At the end of the day they were happy that we provided timely service, kept them informed and made it possible for them to maintain the use of their lighter auxiliary hoist"

A Certified Steel Producer

MAINMAN service technicians helped save the customer $20,000 annually by solving wire rope failures with high strength, improved plow steel wire rope.

A Global Construction Company

The machine run off tests showed that the remanufactured machine was capable of providing the part accuracies and finishes required for pocket facing applications while enhancing safety and productivity.

A Hydroelectric Plant

"We found the RopeQ inspection very valuable. This was a cost-effective way for us to evaluate the condition of the cables, and it is impossible to do a thorough inspection any other way."

A Hydroelectric Plant Customer Story

Konecranes RopeQ inspection helps plan dam maintenance

A Leading Aero-structure Manufacturer

Structure manufacturer Konecranes MTS diagnosed and fixed a long-standing problem, reducing processing time by 60% and saving $300k per year

A Leading Automotive Component Manufacturer

"At the end of the day they were happy that we provided timely service, kept them informed and made it possible for them to maintain the use of their lighter auxiliary hoist"

A Leading Mining Manufacturer

Operator training improves safety, prevents equipment damage at a gypsum quarry.

A Leading Steel Manufacturer

The operator could now trust that the machine would consistently perform the work required. The steel mill experienced a remarkable difference in the dependablity of the machine.

A Manufacturing Company

This speed upgrade improved productivity by 15%.

A Metal Component Machining Facility

Konecranes machine tool upgrade saves customer $300-$500 per hour in downtime expenses.

A Midwest Diesel Engine Manufacturer

By collaborating with Konecranes and sharing expertise, the annual cost per unit has decreased 50% from 2005-2009 with no additional downtime.

A Mining Equipment Manufacturer

The Giddings and Lewis HBM modernization decreased down time while increasing throughput and efficiency. Maintenance costs were greatly reduced.

A Mining Machinery Company

After Konecranes MTS optimized the Cincinnati Gilbert HBM, it performed at the highest level of accuracy ever achieved in its lifetime.

A Navy-Owned Ballistics Laboratory

Konecranes installed a CXT crane for a Navy-Owned Ballistics Laboratory--without knowing the crane's exact application.

A Navy-Owned Ballistics Laboratory Customer Story

Konecranes installed a CXT crane for a Navy-Owned Ballistics Laboratory--without knowing the crane's exact application.

A Paper Company in Michigan

After Konecranes performed repairs to the runway, the crane ran quiet and smooth.

A Rail Car Maker

Konecranes helps rail car maker get back on track after slow down.

A Railroad Company

Konecranes programs "Pitch and Catch" system for a safer lifting situation.

A Southern Aluminum Manufacturer

Konecranes saved the customer $40,000 in product costs, which helped them avoid 12 weeks of downtime.

A Southern Scrap Steel Mill

After five weeks of intensive repairs and upgrades, Konecrane's helped a valued customer weather the storm.

A Specialty Paper Producer

Konecranes upgraded crane with modern controls and water-resistant components—all with three days to spare before the scheduled outage.

A Trailer Manufacturer in Western Canada

Konecranes gave the customer an option that was 95% less costly than making a structural building change.

A Weld Tool Center

Konecranes Circle of Compliance in place, satisfied customer purchased eight more cranes.

A. Reponen Ltd.

Pages